(10)Monday February 11, 2002 - I finished the base cabinet
for the sink and two other base cabinets. I also hooked up the breaker
for the water pump. They are still working on the cement casing
and hopefully will put the pump in tomorrow. The painters did not
come today. I spent several hours attempting to find a septic tank
installer. Of 12 people that I called and left messages, only two
people called me back. I have to have a maintenance contract before
I can even submit my application to the health department for approval.
Then it will take about 25 days. I am to meet with two installers
in the morning and get a contract then I will have to drive back
to the health department and submit my application.
(10)Tuesday February 12, 2002 - I met with two septic installers
today and finally got a maintenance contract so I can turn in my
septic application. They have everything so backwards. I also made
two more base cabinets for the kitchen. All of the base cabinets
are done and I can install them as soon as the painters are done.
The painters painted all of the walls today as well.
(6)Wednesday February 13, 2002 - Patti and I went to the
health department to turn in the septic application. The painters
put one coat of the trim paint on all of the trim and the doors.
They will come back tomorrow to put on one more coat and touch up
any other areas. I spent the afternoon making the ten drawers for
the base cabinets.
(4)Thursday February 14, 2002 - I worked on the drawers
some more. The painters came and put another coat of paint on all
the doors and cleaned up a little.
(3)Friday February 15, 2002 - I had a meeting today so I
went into town and bought some more plywood and came back and put
the bottoms in the drawers. I also bought some parts bins at the
Container Store to organize my shop. I also installed the drawer
slides in one set of drawers. The painters did not come today but
someone is supposed to come on Monday to finish what's left. The
well guys hooke up the tank to the pump so we now have water on
site.
(5)Saturday February 16, 2002 - Terri and Patti worked on
the tile today while I built the vanity cabinet for the bathroom.
The tile in the upstairs bathroom turned out very nice.
(0)Sunday February 17, 2002 - I had to go into work today
to work on my laptop that died on Friday so I didn't get any work
done but Patti grouted most of the tile in the living room and the
utility room.