(0)Monday February 25, 2002 - I worked for my day job today
and didn't get anything done on the house.
(6.5)Tuesday February 26, 2002 - This morning I made the
other drawer for the bathroom vanity and finished putting down all
of the tile in the house. It has been several days since I have
updated this site since my laptop died. I now have windows 2k on
it and I can download images from my camera directly to my laptop
so it should be more convenient. The rest of the day was spent on
my day job.
(0)Wednesday February 27, 2002 - I had to spend all day
today trying to catch up on my day job after my drive crashed.
(0)Thursday February 28, 2002 - Same as yesterday.
(6)Friday March 1, 2002 - This afternoon I got a chance
to grout the rest of the tile. I still need to do a final wash but
I can start installing cabinets now.
What do you get when you mix a 6 year old, some scrap wood, and
a brad nailer together ?
Art !
(8)Saturday March 2, 2002 - I installed the vanity cabinet
in the bathroom and all of the base cabinets in the kitchen. I also
installed some plywood for the counter and cut out the hole for
the sink. I started trimming the plywood and the blade on my saw
was bent so I finished cutting it by hand. My router died when I
went to trim the hardiboard for the counter so I am going home.
I need a new router and saw blade. I didn't get a chance to meet
with the septic installer this week but will meet with him on Tuesday.
We are looking at changing the design to an LPD system that will
not require a maintenance contract at $200+ per year. It may cost
a little more to install but I won't have to worry with a chlorinator
and pay the maintenance fee. I will let you know how things turn
out.
(0)Sunday March 3, 2002 - All I did today was buy a new
router. Check out this bad boy ! 2HP, variable speed plunge router
with micro adjustments to 1/128" also with 1/4" and 1/2"
collets and a dust port. Arh arh arh.